This Rate Valid From: Dec-1-2025 to: 01-06-2026
# HEADS SPEC-0 SPEC-1 SPEC-2 SPEC-2A SPEC-3
1 RATE
of Construction
Rs.2300 to
Rs.2850/Sft
Rs.2300/sft Rs.2500/sft Rs.2650/sft Rs.2850/sft
2 Structural Warranty
(For Structural Elements - Footing, Column, Beams, Roof Slabs)
0 Year 15 Years 15 Years 15 Years 15 Years
3 MAINTENANCE
Period
0 Year 1 Year 1 Year 1 Year 1 Year
4 RETENTION AMOUNT
(After One Year of Completion of Building)
Yes
(Client can pay after 1 Year)
Yes
(Client can pay after 1 Year)
Yes
(Client can pay after 1 Year)
Yes
(Client can pay after 1 Year)
5 ARCHITECTURAL
FLOOR PLAN
Yes Yes Yes Yes Yes
6 ARCHITECTURAL
3D ELEVATION
--- Yes Yes Yes Yes
7 3D VIDEO
WALK AROUND
--- --- --- Yes Yes
8 STRUCTURAL DRAWING
All these drawings are Combined with Agreement
--- • Column
• Footing
• Plinth Beam
• Lintel
• Roof Beam
• Roof Slab
• Joinery Detail
• Staircase Drawings
• Column
• Footing
• Plinth Beam
• Lintel
• Roof Beam
• Roof Slab
• Joinery Detail
• Staircase Drawings
• Column
• Footing
• Plinth Beam
• Lintel
• Roof Beam
• Roof Slab
• Joinery Detail
• Staircase Drawings
• Column
• Footing
• Plinth Beam
• Lintel
• Roof Beam
• Roof Slab
• Joinery Detail
• Staircase Drawings
9 WORKING Drawing --- • Survey Dwg
• Centre Line Dwg
• Column Orientation Dwg
• Marking Dwg
• Stair Centering
• Parapet
• Elevation Detail Dwg
• Boundary Wall with Gate
• Survey Dwg
• Centre Line Dwg
• Column Orientation Dwg
• Marking Dwg
• Stair Centering
• Parapet
• Elevation Detail Dwg
• Boundary Wall with Gate
• Survey Dwg
• Centre Line Dwg
• Column Orientation Dwg
• Marking Dwg
• Stair Centering
• Parapet
• Elevation Detail Dwg
• Boundary Wall with Gate
• Survey Dwg
• Centre Line Dwg
• Column Orientation Dwg
• Marking Dwg
• Stair Centering
• Parapet
• Elevation Detail Dwg
• Boundary Wall with Gate
10 MEP Drawing --- • Lighting and Fan Provision Dwg • Lighting and Fan Provision Dwg • Lighting and Fan Provision Dwg
• Electrical Layout
see Plumbing Water Line Layout,
• Plumbing Drainage Line Layout,
• Detailed HVAC Design
• Lighting and Fan Provision Dwg
• Electrical Layout
• Plumbing Water Line Layout,
• Plumbing Drainage Line Layout,
• Detailed HVAC Design
12 WATER TEST Yes Yes Yes Yes
13 Work Update to Client --- Whatsapp Photo/Video Update Whatsapp Photo/Video Update Whatsapp Photo/Video Update Whatsapp Photo/Video Update
16 Site Survey for Building Marking Tape with Ropes and Pegs Tape Digital Survey with Total Station Digital Survey with Total Station Digital Survey with Total Station Digital Survey with Total Station
18 Roof Beam NO Yes- Framed Structure Yes- Framed Structure Yes- Framed Structure Yes- Framed Structure
19 Cement CLASS- B
(Maha, Ultra, Penna, etc)

CLASS- A Ultratech

CLASS- A Ultratech

CLASS- A Ultratech

CLASS- A Ultratech
20 TMT- STEEL Non-Primary Brand
VIZAG, JSW,ARS

VIZAG, JSW,ARS

VIZAG, JSW,ARS

VIZAG, JSW,ARS
21 M-Sand Market Available Washed M-Sand Washed M-Sand Washed M-Sand Washed M-Sand
22 Concreting Method Manual Compaction with Vibrator machine with Vibrator machine with Vibrator machine with Vibrator machine
23 BRICK WORK Red Bricks Solid Block Wire Cut Red Bricks Wire Cut Red Bricks Wire Cut Red Bricks
Foundation & Basement
24 FOUNDATION DEPTH
upto Hard Stratum
5 Feet
(additional Depth Client Scope)
7 Feet
(additional Depth Client Scope)
7 Feet
(additional Depth Client Scope)
7 Feet
(additional Depth Client Scope)
7 Feet
(additional Depth Client Scope)
25 Footing Concrete M-15 : Manual Mix M-20
1:1.5:3 Manual Mix
M-20 :
M-20 : RMC (Class - A Cement)
M-20 :
M-20 : RMC (Class - A Cement)
M-20 :
M-20 : RMC (Class - A Cement)
27 Footing Concrete Depth 9" to 1' 1'3" to 1'6"
(as per Structural Drawing)
1'3" to 1'6"
(as per Structural Drawing)
1'3" to 1'6"
(as per Structural Drawing)
1'3" to 1'6"
(as per Structural Drawing)
28 MINIMUM SIZE OF COLUMN
Dimension
9" min size: 1'3"
Avg Size: 1'6"
min size: 1'3"
Avg Size: 1'6"
min size: 1'3"
Avg Size: 1'6"
min size: 1'3"
Avg Size: 1'6"
29 COLUMN PROTECTION
(in Water Logging Sites only)
Additionally Charged Asphalt-Bitumen Coating Asphalt-Bitumen Coating Asphalt-Bitumen Coating Asphalt-Bitumen Coating
30 Plinth Beam Concrete M-15 : Manual Mix
1:1.5:3 Manual Mix

M-20 : RMC (Class - A Cement)

M-20 : RMC (Class - A Cement)

M-20 : RMC (Class - A Cement)
31 Plinth Beam Protection Bricks - Below Plinth Beam Absorbs Water PCC (1:4:8) PCC (1:4:8) PCC
M-20 Grade
PCC
M-20 Grade
35 Basement Height
From Existing Ground Level
3' Height 3' Height 3' Height 3' Height 3' Height
37 Basement Brick Work Plastering No Plastering Inner walls All the Walls are Cement plastered both sides with UltraTech Weather Pro admixture All the Walls are Cement plastered both sides with UltraTech Weather Pro admixture All the Walls are Cement plastered both sides with UltraTech Weather Pro admixture All the Walls are Cement plastered both sides with UltraTech Weather Pro admixture
38 Bitumen Coating for
Basement Brick Wall
--- --- --- Emulsion Based Bitumen Coating Applied
(UltraTech BituPro)
Emulsion Based Bitumen Coating Applied
(UltraTech BituPro)
39 Basement PCC M5 (OR) 1:4:8
M 7.5
PCC 1:4:8
6mm GFRB Rod Reinforced at 230mm X 230mm Spacing of 50mm Thick Concrete (M15)

6mm GFRB Rod Reinforced at 230mm X 230mm Spacing of 50mm Thick Concrete (M15)

6mm GFRB Rod Reinforced at 230mm X 230mm Spacing of 50mm Thick Concrete (M15)
40 Damp Proof Treatment
at Basement
--- 2" thick DPC at Floor Level 2" thick DPC at Floor Level 2" thick DPC at Floor Level 2" thick DPC at Floor Level
41 Basement Compaction Method Manual Compaction
with Earth Rammer machine

with Earth Rammer machine

with Earth Rammer machine

with Earth Rammer machine
42 Anti Termite Treatment --- Yes Treated at Basement Yes Treated at Basement Yes Treated at Basement Yes Treated at Basement
43 Compound Wall Construction
(if work included in contract)
On Final Stage without Link with building Tied with Building Plinth Beam Tied with Building Plinth Beam Tied with Building Plinth Beam Tied with Building Plinth Beam
Super Structure
44 External Wall Thickness 9" 9" 9" 9" 9"
45 Internal Wall Thickness 4.5" / 9" 4.5" / 6" 4.5" 4.5" 4.5"
46 Roof Concrete - Grade M-15 : Manual Mix
(or) Additional Cost for RMC

M-20 : RMC

M-20 : RMC

M-25 : RMC

M-25 : RMC
48 SILL BEAM
below Windows at 3'
--- 2" thick Sill Concrete on all walls
using Ready made Sill Plate
2" thick Sill Concrete on all walls
using Ready made Sill Plate
2" thick Sill Concrete on all walls
using Ready made Sill Plate
2" thick Sill Concrete on all walls
using Ready made Sill Plate
49 LINTEL BEAM
at 7'
Cut Lintel Only above windows & Doors Full Lintel Above all walls
(as per Structural Drawing)
Full Lintel Above all walls
(as per Structural Drawing)
Full Lintel Above all walls
(as per Structural Drawing)
Full Lintel Above all walls
(as per Structural Drawing)
50 SUNSHADES
1'6" width
Charged per Sft after completion of work No Extra Charges No Extra Charges No Extra Charges No Extra Charges
51 LOFTS
in Bed Room One Side 1'9" width
Charged per Sft after completion of work No Extra Charges No Extra Charges No Extra Charges No Extra Charges
52 LOFTS
in Kitchen - L-Shaped - 1'9" width
Charged per Sft after completion of work No Extra Charges No Extra Charges No Extra Charges No Extra Charges
54 ROOF Height 10' to 10'6"
Including Slab Thickness
10'9"
Including Slab Thickness
10'9"
Including Slab Thickness
10'9"
Including Slab Thickness
10'9"
Including Slab Thickness
56 Roof Slab Thickness 4" Thick 5" Thick
(as per Structural Drawing)
5" Thick
(as per Structural Drawing)
5" Thick
(as per Structural Drawing)
5" Thick
(as per Structural Drawing)
Curing Period For Civil Works
58 Roof Concrete Curing 21 Days 21 Days 21 Days 21 Days
59 Brick work Curing 8 Days 8 Days 8 Days 8 Days
60 Plastering Curing 8 Days 8 Days 8 Days 8 Days
61 Deshuttering of Roof Slab 15th Day 15th Day 15th Day 15th Day
Tile & Granite
62 Flooring Tile
(Size- 4x2)
Rs.60/sft
Rs.60/sft

Rs.60/sft

Rs.60/sft

Rs.80/sft
63 Toilet Tile Rs.40 to 50
up to Lintel Level
Rs.40 to 50
up to Roof Level
Rs.40 to 50
up to Roof Level
Rs.40 to 50
up to Roof Level
Rs.40 to 50
up to Roof Level
64 Kitchen Wall Tile Rs.40 to 50
up to Lintel Level
Rs.40 to 50
up to Roof Level
Rs.40 to 50
up to Roof Level
Rs.40 to 50
up to Roof Level
Rs.40 to 50
up to Roof Level
65 Parking Floor Tile Additional Charges Rs.40 to 50 Rs.40 to 50 Rs.40 to 50 Rs.40 to 50
66 Sit Out / Elevation Wall Tile :
100sft for every 1000sft Built up area
Additional Charges Rs.40 to 50 Rs.40 to 50 Rs.40 to 50 Rs.40 to 50
67 Main Door Entrance Step Granite Granite @ Rs.120/Sft Granite @ Rs.120/Sft Granite @ Rs.120/Sft Granite @ Rs.120/Sft
68 Inner Staircase Step Granite/Tile Full Body Vitrified Tile @ Rs.100/Sft Full Body Vitrified Tile @ Rs.100/Sft Granite @ Rs.120/Sft Granite @ Rs.120/Sft
69 Outer Staircase Step Cement Flooring Cement Flooring Cement Flooring Full Body Vitrified Tile @ Rs.100/Sft Full Body Vitrified Tile @ Rs.100/Sft
70 Kitchen Counter Top Granite/Tile @ Rs.70/Sft Granite @ Rs.120/Sft Granite @ Rs.120/Sft Granite @ Rs.120/Sft Granite @ Rs.120/Sft
Doors and Windows : Joineries
74 Main Door
(Size 3'6" x 7')
1.25" Thick Teak Door & Frame
Worth Rs.30000
1.5" Thick Teak Door & Frame
Worth Rs.50000
1.5" Thick Teak Door & Frame
Worth Rs.50000
1.5" Thick Teak Door & Frame
Worth Rs.50000
1.5" Thick Teak Door & Frame
Worth Rs.75000
75 Main Door Fittings Brass Coated Full Brass Full Brass Full Brass Full Brass
76 Bed Door
(Size 3' x 7')
Sal Frame & Membrane Door
Worth Rs.8000
Teak Frame & Membrane Door
Worth Rs.8000
Teak Frame & Membrane Door
Worth Rs.13000
Teak Frame & Membrane Door
Worth Rs.13000
1.25" Thick Teak Door & Frame
Worth Rs.30000
77 Bed Door Fittings Powder Coated Fittings SS or Brass Coated Fittings SS or Brass Coated Fittings SS or Brass Coated Fittings Brass Fittings
78 Toilet Door
(Size 2'6" x 7')
PVC @ Rs.3000 PVC @ Rs.3000 PVC @ Rs.3000 WPC / Fibre @ Rs.8000 Teak Colored UPVC @ Rs.15000
80 Backyard Door
(Size 3' x 7')
Sal Frame & Membrane Door
Worth Rs.8000
Steel : GI Door
Rs.20000
Steel : GI Door
Rs.20000
Steel : GI Door
Rs.20000
1.25" Thick Teak Door & Frame
Worth Rs.30000
81 Windows With Grill Sal Wood / UPVC
@ Rs.450/Sft
UPVC @ Rs.550/Sft UPVC @ Rs.550/Sft UPVC @ Rs.550/Sft Polished Teak Wooden Window
(Paint @ Exterior surface)
82 Windows and Exterior Wall Openings
for 2000 Sft Builtup Area
Uncertain or 150 Sft 150 Sft + 1 Main Door 240 Sft + 1 Main Door 300 Sft + 1 Main Door 300 Sft + 1 Main Door
83 Window Grill 10mm Rod 10mm Rod 12mm Rod 12mm Rod 12mm Rod
84 Window Glass 4mm PinHead
@ Rs.35/Sft
4mm Design Glass
@ Rs.42/Sft
4mm Design Glass
@ Rs.42/Sft
4mm Design Glass
@ Rs.42/Sft
4mm Design Glass
@ Rs.42/Sft
Plumbing
85 External Plumbing Pipe Material PVC
UPVC (Kavery)

UPVC (Astral)

UPVC (Astral)

UPVC (Astral)
86 Internal Hot Cold Plumbing Pipe Material CPVC
CPVC (Kavery)

CPVC (Astral)

CPVC (Astral)

CPVC (Astral)
87 Toilet - Instant Water Heater Provision Provided Provided Provided Provided
88 Corporation Water Inlet Till Site Boundary Provided Provided Provided Provided
89 Plumbing Supply Inside Toilet • Bore Water Double Line
• Corporation Water
• Bore Water
Double Line
• Corporation Water
• Bore Water
Triple Line
• Corporation Water
• Bore Water
• Solar Water
Triple Line
• Corporation Water
• Bore Water
• Solar Water
90 Kitchen Sink Taps 1 - Tap 2 - Taps
1 - Corporation Water
2 - Bore Water
2 - Taps
1 - Corporation Water
2 - Bore Water
2 - Taps
1 - Corporation Water
2 - Bore Water
2 - Taps
1 - Corporation Water
2 - Bore Water
92 Garden / Car Wash Taps Additionally Charged 1 - Corporation Water
2 - Bore Water from Pump
3 - Bore Water from OH Tank
1 - Corporation Water
2 - Bore Water from Pump
3 - Bore Water from OH Tank
1 - Corporation Water
2 - Bore Water from Pump
3 - Bore Water from OH Tank
1 - Corporation Water
2 - Bore Water from Pump
3 - Bore Water from OH Tank
94 Pressure Pump --- --- --- Electrical & Plumbing Provision @ Fixing Electrical & Plumbing Provision @ Fixing
95 Plumbing Pipe – Vertical Lines Fixing Fixing along Wall Fixing Away from Wall Fixing Away from Wall Fixing Away from Wall Fixing Away from Wall
96 Bath Fittings
for this Project (2000 Sft)
Uncertain
Rs.100000 - Parryware / Jaquar

Rs.100000 - Parryware / Jaquar

Rs.100000 - Parryware / Jaquar

Rs.150000 - Parryware / Jaquar
97 Over Head Tank – Triple Layer White Additionally Charged 1000 Litre – 2 Nos. 1000 Litre – 2 Nos. 1000 Litre – 2 Nos. 1000 Litre – 2 Nos.
98 Gas Cylinder Provision Outside Kitchen
(Piping: Rs.7000; Steel Cage: Rs.15000)
Provided Provided
ELECTRICAL
99 Wire Any ISI Wire Finolex (Fire Proof) Finolex (Fire Proof) Finolex (Fire Proof) Finolex (Fire Proof)
100 DTH, TV & Wi-Fi Cable Conduits Provided Provided Provided Provided
101 Chemical Earthing Additionally Charged Additionally Charged Provided Provided Provided
102 Electrical Points & Switch Box
on Room Wall
Limited Limited One Switch Box
On 3 Walls of Room
as per Client’s Requirement
One Switch Box
On All 4 Walls of Room
as per Client’s Requirement
One Switch Box
On All 4 Walls of Room
as per Client’s Requirement
103 AC Provision In All Bed Rooms In All Bed Rooms Hall, Dining & All Bed Rooms Hall, Dining & All Bed Rooms
104 Electric Vehicle Charging Provided Provided Provided
105 Dishwasher
(If Required)
Provided Provided
106 Solar Provision in Terrace
(If Required)
Additional Charges Provided Provided
107 Switches
(White Color)
Multi Brand GM, Legrand, Anchor (Penta)
(Door Step Service Warranty)
GM, Legrand, Anchor (Penta)
(Door Step Service Warranty)
GM, Legrand, Anchor (Penta)
(Door Step Service Warranty)
GM, Legrand, Anchor (Penta)
(Door Step Service Warranty)
108 3 Phase Wiring Single Phase
(Additional Cost for 3 Phase)
3 Phase 3 Phase 3 Phase 3 Phase
109 MCB Panel Box with
3 Phase Rotary with MCB
--- Legrand / Fybros
with Rotary Switch
Legrand / Fybros
with Rotary Switch
Legrand / Fybros
with Rotary Switch
Legrand / Fybros
with Rotary Switch
110 Lighting Provision
(SPOT Light)
--- Hall & Portico
Concealed Ceiling Light Provision
Hall & Portico
Concealed Ceiling Light Provision
All Rooms
Provided with Concealed Ceiling Lights
All Rooms
Provided with Concealed Ceiling Lights
111 UPS Wiring Additional Charges Provided at all Box Provided at all Box Provided at all Box Provided at all Box
112 CCTV Piping & Wiring Only --- --- --- Four Camera Points Four Camera Points
OTHERS WORKS
113 Staircase Structure RCC Waist Slab & Brick Steps Monolithic RCC Staircase Monolithic RCC Staircase Monolithic RCC Staircase Monolithic RCC Staircase
114 Inner Staircase Railing SS Railing
Rs.600/Rft
SS Railing
Rs.800/Rft
SS Railing
Rs.800/Rft
SS Railing
Rs.800/Rft
SS Railing with Glass (OR)
MS with Wood
@ Rs.1800/Rft
115 Outer Staircase Railing SS Railing
Rs.600/Rft
MS Railing
Rs.400/Rft
MS Railing
Rs.400/Rft
SS Railing
Rs.800/Rft
SS Railing
Rs.800/Rft
116 Balcony Railing SS Railing
Rs.600/Rft
SS Railing
Rs.800/Rft
SS Railing
Rs.800/Rft
SS Railing
Rs.800/Rft
SS Railing with Glass (OR)
MS with Wood
@ Rs.1800/Rft
117 Parapet Wall 2'6" Height ; 4.5" Thick Wall 3' Height ; 4.5" Thick Wall 3' Height ; 4.5" Thick Wall 3' Height ; 4.5" Thick Wall 3' Height ; 9" Thick Wall
118 Toilet Nische (Shelf) --- --- --- Tile @ Rs.50 / Sft Granite @ Rs.120 / Sft
119 Sunken Slabs for Toilet
(If Required)
Additionally Charged No Extra Charges No Extra Charges No Extra Charges No Extra Charges
120 Toilet Water Proofing Additionally Charged Ultra Tech
Water Proofing Component
Ultra Tech
Water Proofing Component
Ultra Tech
Water Proofing Component
Ultra Tech
Water Proofing Component
121 Ceiling Plastering Preparation --- --- Grooves made using KORAI GRASS mat
while Concreting
Grooves made using KORAI GRASS mat
while Concreting
Grooves made using KORAI GRASS mat
while Concreting
122 Cement Plastering
Mortar Preparation
Manually
Mixer Machine

Mixer Machine

Mixer Machine

Mixer Machine
123 Cement Plastering Application Manually
Power Trowel Machine

Power Trowel Machine

Power Trowel Machine

Power Trowel Machine
124 Ceiling Plastering 1:4 Mix Gypsum Plastering 1:4 Cement Plaster with Machine 1:4 Cement Plaster with Machine 1:4 Cement Plaster with Machine
125 Internal Wall Plastering 1:5 Mix
(No Machine)
Gypsum Plastering 1:5 Cement Plaster with Machine Mix 1:5 Cement Plaster with Machine Mix 1:5 Cement Plaster with Machine Mix
126 External Wall Plastering 1:5 Mix
(No Machine)
(No Admixture)

1:5 Mix with Waterproofing Admixture
UltraTech Weather Pro & Machine Mix

1:5 Mix with Waterproofing Admixture
UltraTech Weather Pro & Machine Mix

1:5 Mix with Waterproofing Admixture
UltraTech Weather Pro & Machine Mix

1:5 Mix with Waterproofing Admixture
UltraTech Weather Pro & Machine Mix
127 External Painting 2 Coat White Wash on all 4 Sides
2 Coat Birla White on 3 Sides
& Putty finish with Asian Apex Paint on Front Side

2 Coat Birla White on 3 Sides
& Putty finish with Asian Apex Paint on Front Side

2 Coat Birla White on 3 Sides
& Putty finish with Asian Apex Paint on Front Side

2 Coat Birla White on 3 Sides
& Putty finish with Asian Apex Paint on Front Side
128 Internal Ceiling Putty No Putty – Only White Wash Gypsum Plastering + 1 Coat Asian Primer 2 Coat Birla Putty + 1 Coat Asian Primer 2 Coat Birla Putty + 1 Coat Asian Primer 2 Coat Birla Putty + 1 Coat Asian Primer
129 Internal Wall Putty 2 Coat Putty + 1 Coat Primer Gypsum Plastering + 1 Coat Asian Primer 2 Coat Birla Putty + 1 Coat Asian Primer 2 Coat Birla Putty + 1 Coat Asian Primer 2 Coat Birla Putty + 1 Coat Asian Primer
130 External Portico Ceiling Putty No Putty – Only White Wash Gypsum Plastering + 1 Coat Asian Primer 2 Coat Birla Putty + 1 Coat Asian Primer 2 Coat Birla Putty + 1 Coat Asian Primer 2 Coat Birla Putty + 1 Coat Asian Primer
131 To Avoid Cracks --- Pillars & Brick Beams & Brick Joints,
Electrical Grooves provided with
Glass Fibre Mesh
Pillars & Brick Beams & Brick Joints,
Electrical Grooves provided with
Glass Fibre Mesh
Pillars & Brick Beams & Brick Joints,
Electrical Grooves provided with
Glass Fibre Mesh
Pillars & Brick Beams & Brick Joints,
Electrical Grooves provided with
Glass Fibre Mesh
132 Column Concrete on Site Preparation Manually Manually Manually Mixer Machine Mixer Machine
133 Set Back Area Between Compound Wall & Building Cement Plastering Cement Plastering Cement Plastering Tile Flooring Tile Flooring
134 Weathering Course Additionally Charged per SFT • Surkhi with Baby chips
• Cement Flooring Finish
• Cool Roof Paint
• Surkhi with Baby chips
• Cement Flooring Finish
• Cool Roof Paint
• Surkhi with Baby chips
• Cool Roof Tile
• Surkhi with Baby chips
• Cool Roof Tile
135 Basement Height of Parking Floor On Ground Level 2' Below Ground FFL 2' Below Ground FFL 2' Below Ground FFL 2' Below Ground FFL
136 M.S Stand for Drying Cloth in Terrace Additionally Charged 1 Set Provided 1 Set Provided 1 Set Provided 1 Set Provided
137 Washing Stone, Water Supply & Drainage Additionally Charged Provided Provided Provided Provided
138 Soak Pit
(If Drainage not Provided in Lay-Out)
Additionally Charged 3' Dia Ring of 5' Depth – 1 No 3' Dia Ring of 5' Depth – 1 No 3' Dia Ring of 5' Depth – 1 No 3' Dia Ring of 5' Depth – 1 No
139 Inspection Chambers for Waste Water Plumbing Additionally Charged No Extra Charges No Extra Charges No Extra Charges No Extra Charges
140 Cement Room / Workers Shed Additionally Charged No Extra Charges No Extra Charges No Extra Charges No Extra Charges
149 Planter Box Outside the Building
(If Required)
Additionally Charged Additionally Charged Additionally Charged No Extra Charges No Extra Charges
150 Pergola in Concrete or Steel Fabrication
(If Required)
Additionally Charged Additionally Charged Additionally Charged Additionally Charged Additionally Charged
151 Glass Works : Toughened Glass / Elevation Glass Works
(If Required)
Additionally Charged Additionally Charged Additionally Charged Additionally Charged Additionally Charged
157 Elevation Works Charges
(If Masonry inside Plinth Area)
Additionally Charged No Extra Charges No Extra Charges No Extra Charges No Extra Charges

NOTE: Owner’s Scope

  • Electricity will be provided by Owner – 3 Phase
  • Water will be provided by Owner
  • Land for Workers Shed will be provided by Owner
  • Building Plan Approval will be provided by Owner
  • Borewell & Pump Set will be provided by Owner
  • Electricity Final Shifting, Panel Box & Government Charges
  • Electrical fittings like Fan, Light, Motor Pumps, Pressure Pump, Water Heater will be provided by Owner
  • Interior Works or Cuddapah Shelf are not included in the estimation
Payment Schedule
1 Mobilisation on Bhoomi Pooja Start Day 10%
2 After Completion of Plinth Beam 10%
3 After completion of Basement 10%
4 After completion of GF Lintel Level 10%
5 On the day of completion of G.F - R.C Roof Concrete 10%
6 After completion of FF Lintel Level 10%
7 On the day of completion of F.F - R.C Roof Concrete 10%
8 After Completion of Internal plastering 10%
9 After Completion of External plastering 10%
10 After Completion of Flooring 5%
11 At the time of Handing Over of Key 4%
12 After 1 Year (365 Days) of House Warming 1%
TOTAL 100%