| This Rate Valid From: Dec-1-2025 to: 01-06-2026 | ||||||
| # | HEADS | SPEC-0 | SPEC-1 | SPEC-2 | SPEC-2A | SPEC-3 |
|---|---|---|---|---|---|---|
| 1 | RATE of Construction |
Rs.2300 to Rs.2850/Sft |
Rs.2300/sft | Rs.2500/sft | Rs.2650/sft | Rs.2850/sft |
| 2 |
Structural Warranty (For Structural Elements - Footing, Column, Beams, Roof Slabs) |
0 Year | 15 Years | 15 Years | 15 Years | 15 Years |
| 3 | MAINTENANCE Period |
0 Year | 1 Year | 1 Year | 1 Year | 1 Year |
| 4 |
RETENTION AMOUNT (After One Year of Completion of Building) |
— | Yes (Client can pay after 1 Year) |
Yes (Client can pay after 1 Year) |
Yes (Client can pay after 1 Year) |
Yes (Client can pay after 1 Year) |
| 5 | ARCHITECTURAL FLOOR PLAN |
Yes | Yes | Yes | Yes | Yes |
| 6 | ARCHITECTURAL 3D ELEVATION |
--- | Yes | Yes | Yes | Yes |
| 7 | 3D VIDEO WALK AROUND |
--- | --- | --- | Yes | Yes |
| 8 |
STRUCTURAL DRAWING All these drawings are Combined with Agreement |
--- |
• Column • Footing • Plinth Beam • Lintel • Roof Beam • Roof Slab • Joinery Detail • Staircase Drawings |
• Column • Footing • Plinth Beam • Lintel • Roof Beam • Roof Slab • Joinery Detail • Staircase Drawings |
• Column • Footing • Plinth Beam • Lintel • Roof Beam • Roof Slab • Joinery Detail • Staircase Drawings |
• Column • Footing • Plinth Beam • Lintel • Roof Beam • Roof Slab • Joinery Detail • Staircase Drawings |
| 9 | WORKING Drawing | --- |
• Survey Dwg • Centre Line Dwg • Column Orientation Dwg • Marking Dwg • Stair Centering • Parapet • Elevation Detail Dwg • Boundary Wall with Gate |
• Survey Dwg • Centre Line Dwg • Column Orientation Dwg • Marking Dwg • Stair Centering • Parapet • Elevation Detail Dwg • Boundary Wall with Gate |
• Survey Dwg • Centre Line Dwg • Column Orientation Dwg • Marking Dwg • Stair Centering • Parapet • Elevation Detail Dwg • Boundary Wall with Gate |
• Survey Dwg • Centre Line Dwg • Column Orientation Dwg • Marking Dwg • Stair Centering • Parapet • Elevation Detail Dwg • Boundary Wall with Gate |
| 10 | MEP Drawing | --- | • Lighting and Fan Provision Dwg | • Lighting and Fan Provision Dwg |
• Lighting and Fan Provision Dwg • Electrical Layout see Plumbing Water Line Layout, • Plumbing Drainage Line Layout, • Detailed HVAC Design |
• Lighting and Fan Provision Dwg • Electrical Layout • Plumbing Water Line Layout, • Plumbing Drainage Line Layout, • Detailed HVAC Design |
| 12 | WATER TEST | Yes | Yes | Yes | Yes | |
| 13 | Work Update to Client | --- | Whatsapp Photo/Video Update | Whatsapp Photo/Video Update | Whatsapp Photo/Video Update | Whatsapp Photo/Video Update |
| 16 | Site Survey for Building Marking | Tape with Ropes and Pegs Tape | Digital Survey with Total Station | Digital Survey with Total Station | Digital Survey with Total Station | Digital Survey with Total Station |
| 18 | Roof Beam | NO | Yes- Framed Structure | Yes- Framed Structure | Yes- Framed Structure | Yes- Framed Structure |
| 19 | Cement |
CLASS- B (Maha, Ultra, Penna, etc) |
![]() CLASS- A Ultratech |
![]() CLASS- A Ultratech |
![]() CLASS- A Ultratech |
![]() CLASS- A Ultratech |
| 20 | TMT- STEEL | Non-Primary Brand |
VIZAG, JSW,ARS |
VIZAG, JSW,ARS |
VIZAG, JSW,ARS |
VIZAG, JSW,ARS |
| 21 | M-Sand | Market Available | Washed M-Sand | Washed M-Sand | Washed M-Sand | Washed M-Sand |
| 22 | Concreting Method | Manual Compaction | with Vibrator machine | with Vibrator machine | with Vibrator machine | with Vibrator machine |
| 23 | BRICK WORK | Red Bricks | Solid Block | Wire Cut Red Bricks | Wire Cut Red Bricks | Wire Cut Red Bricks |
| Foundation & Basement | ||||||
| 24 |
FOUNDATION DEPTH upto Hard Stratum |
5 Feet (additional Depth Client Scope) |
7 Feet (additional Depth Client Scope) |
7 Feet (additional Depth Client Scope) |
7 Feet (additional Depth Client Scope) |
7 Feet (additional Depth Client Scope) |
| 25 | Footing Concrete | M-15 : Manual Mix | M-20 1:1.5:3 Manual Mix |
M-20 : ![]() M-20 : RMC (Class - A Cement) |
M-20 : ![]() M-20 : RMC (Class - A Cement) |
M-20 : ![]() M-20 : RMC (Class - A Cement) |
| 27 | Footing Concrete Depth | 9" to 1' | 1'3" to 1'6" (as per Structural Drawing) |
1'3" to 1'6" (as per Structural Drawing) |
1'3" to 1'6" (as per Structural Drawing) |
1'3" to 1'6" (as per Structural Drawing) |
| 28 |
MINIMUM SIZE OF COLUMN Dimension |
9" | min size: 1'3" Avg Size: 1'6" |
min size: 1'3" Avg Size: 1'6" |
min size: 1'3" Avg Size: 1'6" |
min size: 1'3" Avg Size: 1'6" |
| 29 |
COLUMN PROTECTION (in Water Logging Sites only) |
Additionally Charged | Asphalt-Bitumen Coating | Asphalt-Bitumen Coating | Asphalt-Bitumen Coating | Asphalt-Bitumen Coating |
| 30 | Plinth Beam Concrete | M-15 : Manual Mix |
1:1.5:3 Manual Mix |
![]() M-20 : RMC (Class - A Cement) |
![]() M-20 : RMC (Class - A Cement) |
![]() M-20 : RMC (Class - A Cement) |
| 31 | Plinth Beam Protection | Bricks - Below Plinth Beam Absorbs Water | PCC (1:4:8) | PCC (1:4:8) | PCC M-20 Grade |
PCC M-20 Grade |
| 35 |
Basement Height From Existing Ground Level |
3' Height | 3' Height | 3' Height | 3' Height | 3' Height |
| 37 | Basement Brick Work Plastering | No Plastering Inner walls | All the Walls are Cement plastered both sides with UltraTech Weather Pro admixture | All the Walls are Cement plastered both sides with UltraTech Weather Pro admixture | All the Walls are Cement plastered both sides with UltraTech Weather Pro admixture | All the Walls are Cement plastered both sides with UltraTech Weather Pro admixture |
| 38 |
Bitumen Coating for Basement Brick Wall |
--- | --- | --- |
Emulsion Based Bitumen Coating Applied (UltraTech BituPro) |
Emulsion Based Bitumen Coating Applied (UltraTech BituPro) |
| 39 | Basement PCC | M5 (OR) 1:4:8 M 7.5 |
PCC 1:4:8 |
![]() 6mm GFRB Rod Reinforced at 230mm X 230mm Spacing of 50mm Thick Concrete (M15) |
![]() 6mm GFRB Rod Reinforced at 230mm X 230mm Spacing of 50mm Thick Concrete (M15) |
![]() 6mm GFRB Rod Reinforced at 230mm X 230mm Spacing of 50mm Thick Concrete (M15) |
| 40 |
Damp Proof Treatment at Basement |
--- | 2" thick DPC at Floor Level | 2" thick DPC at Floor Level | 2" thick DPC at Floor Level | 2" thick DPC at Floor Level |
| 41 | Basement Compaction Method | Manual Compaction | ![]() with Earth Rammer machine |
![]() with Earth Rammer machine |
![]() with Earth Rammer machine |
![]() with Earth Rammer machine |
| 42 | Anti Termite Treatment | --- | Yes Treated at Basement | Yes Treated at Basement | Yes Treated at Basement | Yes Treated at Basement |
| 43 |
Compound Wall Construction (if work included in contract) |
On Final Stage without Link with building | Tied with Building Plinth Beam | Tied with Building Plinth Beam | Tied with Building Plinth Beam | Tied with Building Plinth Beam |
| Super Structure | ||||||
| 44 | External Wall Thickness | 9" | 9" | 9" | 9" | 9" |
| 45 | Internal Wall Thickness | 4.5" / 9" | 4.5" / 6" | 4.5" | 4.5" | 4.5" |
| 46 | Roof Concrete - Grade |
M-15 : Manual Mix (or) Additional Cost for RMC |
![]() M-20 : RMC |
![]() M-20 : RMC |
![]() M-25 : RMC |
![]() M-25 : RMC |
| 48 |
SILL BEAM below Windows at 3' |
--- |
2" thick Sill Concrete on all walls using Ready made Sill Plate |
2" thick Sill Concrete on all walls using Ready made Sill Plate |
2" thick Sill Concrete on all walls using Ready made Sill Plate |
2" thick Sill Concrete on all walls using Ready made Sill Plate |
| 49 |
LINTEL BEAM at 7' |
Cut Lintel Only above windows & Doors |
Full Lintel Above all walls (as per Structural Drawing) |
Full Lintel Above all walls (as per Structural Drawing) |
Full Lintel Above all walls (as per Structural Drawing) |
Full Lintel Above all walls (as per Structural Drawing) |
| 50 |
SUNSHADES 1'6" width |
Charged per Sft after completion of work | No Extra Charges | No Extra Charges | No Extra Charges | No Extra Charges |
| 51 |
LOFTS in Bed Room One Side 1'9" width |
Charged per Sft after completion of work | No Extra Charges | No Extra Charges | No Extra Charges | No Extra Charges |
| 52 |
LOFTS in Kitchen - L-Shaped - 1'9" width |
Charged per Sft after completion of work | No Extra Charges | No Extra Charges | No Extra Charges | No Extra Charges |
| 54 | ROOF Height | 10' to 10'6" Including Slab Thickness |
10'9" Including Slab Thickness |
10'9" Including Slab Thickness |
10'9" Including Slab Thickness |
10'9" Including Slab Thickness |
| 56 | Roof Slab Thickness | 4" Thick | 5" Thick (as per Structural Drawing) |
5" Thick (as per Structural Drawing) |
5" Thick (as per Structural Drawing) |
5" Thick (as per Structural Drawing) |
| Curing Period For Civil Works | ||||||
| 58 | Roof Concrete Curing | 21 Days | 21 Days | 21 Days | 21 Days | |
| 59 | Brick work Curing | 8 Days | 8 Days | 8 Days | 8 Days | |
| 60 | Plastering Curing | 8 Days | 8 Days | 8 Days | 8 Days | |
| 61 | Deshuttering of Roof Slab | 15th Day | 15th Day | 15th Day | 15th Day | |
| Tile & Granite | ||||||
| 62 |
Flooring Tile (Size- 4x2) |
Rs.60/sft | ![]() Rs.60/sft |
![]() Rs.60/sft |
![]() Rs.60/sft |
![]() Rs.80/sft |
| 63 | Toilet Tile | Rs.40 to 50 up to Lintel Level |
Rs.40 to 50 up to Roof Level |
Rs.40 to 50 up to Roof Level |
Rs.40 to 50 up to Roof Level |
Rs.40 to 50 up to Roof Level |
| 64 | Kitchen Wall Tile | Rs.40 to 50 up to Lintel Level |
Rs.40 to 50 up to Roof Level |
Rs.40 to 50 up to Roof Level |
Rs.40 to 50 up to Roof Level |
Rs.40 to 50 up to Roof Level |
| 65 | Parking Floor Tile | Additional Charges | Rs.40 to 50 | Rs.40 to 50 | Rs.40 to 50 | Rs.40 to 50 |
| 66 |
Sit Out / Elevation Wall Tile : 100sft for every 1000sft Built up area |
Additional Charges | Rs.40 to 50 | Rs.40 to 50 | Rs.40 to 50 | Rs.40 to 50 |
| 67 | Main Door Entrance Step | Granite | Granite @ Rs.120/Sft | Granite @ Rs.120/Sft | Granite @ Rs.120/Sft | Granite @ Rs.120/Sft |
| 68 | Inner Staircase Step | Granite/Tile | Full Body Vitrified Tile @ Rs.100/Sft | Full Body Vitrified Tile @ Rs.100/Sft | Granite @ Rs.120/Sft | Granite @ Rs.120/Sft |
| 69 | Outer Staircase Step | Cement Flooring | Cement Flooring | Cement Flooring | Full Body Vitrified Tile @ Rs.100/Sft | Full Body Vitrified Tile @ Rs.100/Sft |
| 70 | Kitchen Counter Top | Granite/Tile @ Rs.70/Sft | Granite @ Rs.120/Sft | Granite @ Rs.120/Sft | Granite @ Rs.120/Sft | Granite @ Rs.120/Sft |
| Doors and Windows : Joineries | ||||||
| 74 | Main Door (Size 3'6" x 7') |
1.25" Thick Teak Door & Frame Worth Rs.30000 |
1.5" Thick Teak Door & Frame Worth Rs.50000 |
1.5" Thick Teak Door & Frame Worth Rs.50000 |
1.5" Thick Teak Door & Frame Worth Rs.50000 |
1.5" Thick Teak Door & Frame Worth Rs.75000 |
| 75 | Main Door Fittings | Brass Coated | Full Brass | Full Brass | Full Brass | Full Brass |
| 76 | Bed Door (Size 3' x 7') |
Sal Frame & Membrane Door Worth Rs.8000 |
Teak Frame & Membrane Door Worth Rs.8000 |
Teak Frame & Membrane Door Worth Rs.13000 |
Teak Frame & Membrane Door Worth Rs.13000 |
1.25" Thick Teak Door & Frame Worth Rs.30000 |
| 77 | Bed Door Fittings | Powder Coated Fittings | SS or Brass Coated Fittings | SS or Brass Coated Fittings | SS or Brass Coated Fittings | Brass Fittings |
| 78 | Toilet Door (Size 2'6" x 7') |
PVC @ Rs.3000 | PVC @ Rs.3000 | PVC @ Rs.3000 | WPC / Fibre @ Rs.8000 | Teak Colored UPVC @ Rs.15000 |
| 80 | Backyard Door (Size 3' x 7') |
Sal Frame & Membrane Door Worth Rs.8000 |
Steel : GI Door Rs.20000 |
Steel : GI Door Rs.20000 |
Steel : GI Door Rs.20000 |
1.25" Thick Teak Door & Frame Worth Rs.30000 |
| 81 | Windows With Grill | Sal Wood / UPVC @ Rs.450/Sft |
UPVC @ Rs.550/Sft | UPVC @ Rs.550/Sft | UPVC @ Rs.550/Sft | Polished Teak Wooden Window (Paint @ Exterior surface) |
| 82 | Windows and Exterior Wall Openings for 2000 Sft Builtup Area |
Uncertain or 150 Sft | 150 Sft + 1 Main Door | 240 Sft + 1 Main Door | 300 Sft + 1 Main Door | 300 Sft + 1 Main Door |
| 83 | Window Grill | 10mm Rod | 10mm Rod | 12mm Rod | 12mm Rod | 12mm Rod |
| 84 | Window Glass | 4mm PinHead @ Rs.35/Sft |
4mm Design Glass @ Rs.42/Sft |
4mm Design Glass @ Rs.42/Sft |
4mm Design Glass @ Rs.42/Sft |
4mm Design Glass @ Rs.42/Sft |
| Plumbing | ||||||
| 85 | External Plumbing Pipe Material | PVC | ![]() UPVC (Kavery) |
![]() UPVC (Astral) |
![]() UPVC (Astral) |
![]() UPVC (Astral) |
| 86 | Internal Hot Cold Plumbing Pipe Material | CPVC | ![]() CPVC (Kavery) |
![]() CPVC (Astral) |
![]() CPVC (Astral) |
![]() CPVC (Astral) |
| 87 | Toilet - Instant Water Heater Provision | — | Provided | Provided | Provided | Provided |
| 88 | Corporation Water Inlet Till Site Boundary | — | Provided | Provided | Provided | Provided |
| 89 | Plumbing Supply Inside Toilet | • Bore Water |
Double Line • Corporation Water • Bore Water |
Double Line • Corporation Water • Bore Water |
Triple Line • Corporation Water • Bore Water • Solar Water |
Triple Line • Corporation Water • Bore Water • Solar Water |
| 90 | Kitchen Sink Taps | 1 - Tap |
2 - Taps 1 - Corporation Water 2 - Bore Water |
2 - Taps 1 - Corporation Water 2 - Bore Water |
2 - Taps 1 - Corporation Water 2 - Bore Water |
2 - Taps 1 - Corporation Water 2 - Bore Water |
| 92 | Garden / Car Wash Taps | Additionally Charged |
1 - Corporation Water 2 - Bore Water from Pump 3 - Bore Water from OH Tank |
1 - Corporation Water 2 - Bore Water from Pump 3 - Bore Water from OH Tank |
1 - Corporation Water 2 - Bore Water from Pump 3 - Bore Water from OH Tank |
1 - Corporation Water 2 - Bore Water from Pump 3 - Bore Water from OH Tank |
| 94 | Pressure Pump | --- | --- | --- | Electrical & Plumbing Provision @ Fixing | Electrical & Plumbing Provision @ Fixing |
| 95 | Plumbing Pipe – Vertical Lines Fixing | Fixing along Wall | Fixing Away from Wall | Fixing Away from Wall | Fixing Away from Wall | Fixing Away from Wall |
| 96 | Bath Fittings for this Project (2000 Sft) |
Uncertain | ![]() Rs.100000 - Parryware / Jaquar |
![]() Rs.100000 - Parryware / Jaquar |
![]() Rs.100000 - Parryware / Jaquar |
![]() Rs.150000 - Parryware / Jaquar |
| 97 | Over Head Tank – Triple Layer White | Additionally Charged | 1000 Litre – 2 Nos. | 1000 Litre – 2 Nos. | 1000 Litre – 2 Nos. | 1000 Litre – 2 Nos. |
| 98 | Gas Cylinder Provision Outside Kitchen (Piping: Rs.7000; Steel Cage: Rs.15000) |
— | — | — | Provided | Provided |
| ELECTRICAL | ||||||
| 99 | Wire | Any ISI Wire | Finolex (Fire Proof) | Finolex (Fire Proof) | Finolex (Fire Proof) | Finolex (Fire Proof) |
| 100 | DTH, TV & Wi-Fi Cable Conduits | — | Provided | Provided | Provided | Provided |
| 101 | Chemical Earthing | Additionally Charged | Additionally Charged | Provided | Provided | Provided |
| 102 | Electrical Points & Switch Box on Room Wall |
Limited | Limited |
One Switch Box On 3 Walls of Room as per Client’s Requirement |
One Switch Box On All 4 Walls of Room as per Client’s Requirement |
One Switch Box On All 4 Walls of Room as per Client’s Requirement |
| 103 | AC Provision | — | In All Bed Rooms | In All Bed Rooms | Hall, Dining & All Bed Rooms | Hall, Dining & All Bed Rooms |
| 104 | Electric Vehicle Charging | — | — | Provided | Provided | Provided |
| 105 | Dishwasher (If Required) |
— | — | — | Provided | Provided |
| 106 | Solar Provision in Terrace (If Required) |
Additional Charges | — | — | Provided | Provided |
| 107 | Switches (White Color) |
Multi Brand | GM, Legrand, Anchor (Penta) (Door Step Service Warranty) |
GM, Legrand, Anchor (Penta) (Door Step Service Warranty) |
GM, Legrand, Anchor (Penta) (Door Step Service Warranty) |
GM, Legrand, Anchor (Penta) (Door Step Service Warranty) |
| 108 | 3 Phase Wiring | Single Phase (Additional Cost for 3 Phase) |
3 Phase | 3 Phase | 3 Phase | 3 Phase |
| 109 | MCB Panel Box with 3 Phase Rotary with MCB |
--- | Legrand / Fybros with Rotary Switch |
Legrand / Fybros with Rotary Switch |
Legrand / Fybros with Rotary Switch |
Legrand / Fybros with Rotary Switch |
| 110 | Lighting Provision (SPOT Light) |
--- |
Hall & Portico Concealed Ceiling Light Provision |
Hall & Portico Concealed Ceiling Light Provision |
All Rooms Provided with Concealed Ceiling Lights |
All Rooms Provided with Concealed Ceiling Lights |
| 111 | UPS Wiring | Additional Charges | Provided at all Box | Provided at all Box | Provided at all Box | Provided at all Box |
| 112 | CCTV Piping & Wiring Only | --- | --- | --- | Four Camera Points | Four Camera Points |
| OTHERS WORKS | ||||||
| 113 | Staircase Structure | RCC Waist Slab & Brick Steps | Monolithic RCC Staircase | Monolithic RCC Staircase | Monolithic RCC Staircase | Monolithic RCC Staircase |
| 114 | Inner Staircase Railing | SS Railing Rs.600/Rft |
SS Railing Rs.800/Rft |
SS Railing Rs.800/Rft |
SS Railing Rs.800/Rft |
SS Railing with Glass (OR) MS with Wood @ Rs.1800/Rft |
| 115 | Outer Staircase Railing | SS Railing Rs.600/Rft |
MS Railing Rs.400/Rft |
MS Railing Rs.400/Rft |
SS Railing Rs.800/Rft |
SS Railing Rs.800/Rft |
| 116 | Balcony Railing | SS Railing Rs.600/Rft |
SS Railing Rs.800/Rft |
SS Railing Rs.800/Rft |
SS Railing Rs.800/Rft |
SS Railing with Glass (OR) MS with Wood @ Rs.1800/Rft |
| 117 | Parapet Wall | 2'6" Height ; 4.5" Thick Wall | 3' Height ; 4.5" Thick Wall | 3' Height ; 4.5" Thick Wall | 3' Height ; 4.5" Thick Wall | 3' Height ; 9" Thick Wall |
| 118 | Toilet Nische (Shelf) | --- | --- | --- | Tile @ Rs.50 / Sft | Granite @ Rs.120 / Sft |
| 119 | Sunken Slabs for Toilet (If Required) |
Additionally Charged | No Extra Charges | No Extra Charges | No Extra Charges | No Extra Charges |
| 120 | Toilet Water Proofing | Additionally Charged | Ultra Tech Water Proofing Component |
Ultra Tech Water Proofing Component |
Ultra Tech Water Proofing Component |
Ultra Tech Water Proofing Component |
| 121 | Ceiling Plastering Preparation | --- | --- |
Grooves made using KORAI GRASS mat while Concreting |
Grooves made using KORAI GRASS mat while Concreting |
Grooves made using KORAI GRASS mat while Concreting |
| 122 | Cement Plastering Mortar Preparation |
Manually | ![]() Mixer Machine |
![]() Mixer Machine |
![]() Mixer Machine |
![]() Mixer Machine |
| 123 | Cement Plastering Application | Manually | ![]() Power Trowel Machine |
![]() Power Trowel Machine |
![]() Power Trowel Machine |
![]() Power Trowel Machine |
| 124 | Ceiling Plastering | 1:4 Mix | Gypsum Plastering | 1:4 Cement Plaster with Machine | 1:4 Cement Plaster with Machine | 1:4 Cement Plaster with Machine |
| 125 | Internal Wall Plastering | 1:5 Mix (No Machine) |
Gypsum Plastering | 1:5 Cement Plaster with Machine Mix | 1:5 Cement Plaster with Machine Mix | 1:5 Cement Plaster with Machine Mix |
| 126 | External Wall Plastering | 1:5 Mix (No Machine) (No Admixture) |
![]() 1:5 Mix with Waterproofing Admixture UltraTech Weather Pro & Machine Mix |
![]() 1:5 Mix with Waterproofing Admixture UltraTech Weather Pro & Machine Mix |
![]() 1:5 Mix with Waterproofing Admixture UltraTech Weather Pro & Machine Mix |
![]() 1:5 Mix with Waterproofing Admixture UltraTech Weather Pro & Machine Mix |
| 127 | External Painting | 2 Coat White Wash on all 4 Sides |
![]() 2 Coat Birla White on 3 Sides & Putty finish with Asian Apex Paint on Front Side |
![]() 2 Coat Birla White on 3 Sides & Putty finish with Asian Apex Paint on Front Side |
![]() 2 Coat Birla White on 3 Sides & Putty finish with Asian Apex Paint on Front Side |
![]() 2 Coat Birla White on 3 Sides & Putty finish with Asian Apex Paint on Front Side |
| 128 | Internal Ceiling Putty | No Putty – Only White Wash | Gypsum Plastering + 1 Coat Asian Primer | 2 Coat Birla Putty + 1 Coat Asian Primer | 2 Coat Birla Putty + 1 Coat Asian Primer | 2 Coat Birla Putty + 1 Coat Asian Primer |
| 129 | Internal Wall Putty | 2 Coat Putty + 1 Coat Primer | Gypsum Plastering + 1 Coat Asian Primer | 2 Coat Birla Putty + 1 Coat Asian Primer | 2 Coat Birla Putty + 1 Coat Asian Primer | 2 Coat Birla Putty + 1 Coat Asian Primer |
| 130 | External Portico Ceiling Putty | No Putty – Only White Wash | Gypsum Plastering + 1 Coat Asian Primer | 2 Coat Birla Putty + 1 Coat Asian Primer | 2 Coat Birla Putty + 1 Coat Asian Primer | 2 Coat Birla Putty + 1 Coat Asian Primer |
| 131 | To Avoid Cracks | --- |
Pillars & Brick Beams & Brick Joints, Electrical Grooves provided with Glass Fibre Mesh |
Pillars & Brick Beams & Brick Joints, Electrical Grooves provided with Glass Fibre Mesh |
Pillars & Brick Beams & Brick Joints, Electrical Grooves provided with Glass Fibre Mesh |
Pillars & Brick Beams & Brick Joints, Electrical Grooves provided with Glass Fibre Mesh |
| 132 | Column Concrete on Site Preparation | Manually | Manually | Manually | Mixer Machine | Mixer Machine |
| 133 | Set Back Area Between Compound Wall & Building | Cement Plastering | Cement Plastering | Cement Plastering | Tile Flooring | Tile Flooring |
| 134 | Weathering Course | Additionally Charged per SFT |
• Surkhi with Baby chips • Cement Flooring Finish • Cool Roof Paint |
• Surkhi with Baby chips • Cement Flooring Finish • Cool Roof Paint |
• Surkhi with Baby chips • Cool Roof Tile |
• Surkhi with Baby chips • Cool Roof Tile |
| 135 | Basement Height of Parking Floor | On Ground Level | 2' Below Ground FFL | 2' Below Ground FFL | 2' Below Ground FFL | 2' Below Ground FFL |
| 136 | M.S Stand for Drying Cloth in Terrace | Additionally Charged | 1 Set Provided | 1 Set Provided | 1 Set Provided | 1 Set Provided |
| 137 | Washing Stone, Water Supply & Drainage | Additionally Charged | Provided | Provided | Provided | Provided |
| 138 | Soak Pit (If Drainage not Provided in Lay-Out) |
Additionally Charged | 3' Dia Ring of 5' Depth – 1 No | 3' Dia Ring of 5' Depth – 1 No | 3' Dia Ring of 5' Depth – 1 No | 3' Dia Ring of 5' Depth – 1 No |
| 139 | Inspection Chambers for Waste Water Plumbing | Additionally Charged | No Extra Charges | No Extra Charges | No Extra Charges | No Extra Charges |
| 140 | Cement Room / Workers Shed | Additionally Charged | No Extra Charges | No Extra Charges | No Extra Charges | No Extra Charges |
| 149 | Planter Box Outside the Building (If Required) |
Additionally Charged | Additionally Charged | Additionally Charged | No Extra Charges | No Extra Charges |
| 150 | Pergola in Concrete or Steel Fabrication (If Required) |
Additionally Charged | Additionally Charged | Additionally Charged | Additionally Charged | Additionally Charged |
| 151 | Glass Works : Toughened Glass / Elevation Glass Works (If Required) |
Additionally Charged | Additionally Charged | Additionally Charged | Additionally Charged | Additionally Charged |
| 157 |
Elevation Works Charges (If Masonry inside Plinth Area) |
Additionally Charged | No Extra Charges | No Extra Charges | No Extra Charges | No Extra Charges |
NOTE: Owner’s Scope
- Electricity will be provided by Owner – 3 Phase
- Water will be provided by Owner
- Land for Workers Shed will be provided by Owner
- Building Plan Approval will be provided by Owner
- Borewell & Pump Set will be provided by Owner
- Electricity Final Shifting, Panel Box & Government Charges
- Electrical fittings like Fan, Light, Motor Pumps, Pressure Pump, Water Heater will be provided by Owner
- Interior Works or Cuddapah Shelf are not included in the estimation
| Payment Schedule | |||||
|---|---|---|---|---|---|
| 1 | Mobilisation on Bhoomi Pooja Start Day | 10% | |||
| 2 | After Completion of Plinth Beam | 10% | |||
| 3 | After completion of Basement | 10% | |||
| 4 | After completion of GF Lintel Level | 10% | |||
| 5 | On the day of completion of G.F - R.C Roof Concrete | 10% | |||
| 6 | After completion of FF Lintel Level | 10% | |||
| 7 | On the day of completion of F.F - R.C Roof Concrete | 10% | |||
| 8 | After Completion of Internal plastering | 10% | |||
| 9 | After Completion of External plastering | 10% | |||
| 10 | After Completion of Flooring | 5% | |||
| 11 | At the time of Handing Over of Key | 4% | |||
| 12 | After 1 Year (365 Days) of House Warming | 1% | |||
| TOTAL | 100% | ||||






.webp)